Certificates & reference tools
EIC, EICR, MWC and nine more cert types. Max Zs, RCD times and BS 7671 Amendment 4 references are the live proof surfaces.
A distribution board starts as design intent, then becomes priced scope, installed work, test evidence, a certificate line, an O&M entry, valuation evidence and a CDE submission. Today, each stage often rebuilds the same facts in a different system.
The board is physical. The work around it is information.
Describe the object once: board, circuit, device, cable, location, standard, evidence. That object should feed the estimate, certificate, O&M, valuation, document register and handover pack. The agent handles the repeatable movement. The human keeps control of judgement, approvals and relationships.
Prekon is being built in public: useful tools first, role-level proof next, platform claims only where the work exists.
EIC, EICR, MWC and nine more cert types. Max Zs, RCD times and BS 7671 Amendment 4 references are the live proof surfaces.
Observation-to-quote for EICR remedials. Standalone estimating engine with costed circuits and labour hours as the platform asset.
Real construction roles broken into tasks, costed, scored, then rebuilt as workflow automations, approval queues and tool-using agents. Document Controller first.
The full platform position: design, estimate, certs, O&Ms, document control, payments and handover over one project model.
We take real job descriptions, separate repeatable information work from human judgement, then build the automatable parts in public.
The opening argument for the whole series: construction's physical work remains human; the repeatable operating layer around it is exposed.
Read the foundation pieceRole by role, task by task, with cost, benefit, failure points and practical workflow builds.
View the seriesThe satellite tools bring working electricians into Prekon through practical, searchable reference pages.
A fast lookup of BS 7671 maximum permitted Zs values, Cmin-corrected.
Fast lookup for BS 7671 RCD disconnection times, fault protection, and additional protection checks.
Plain-English companion to Amendment 4 of BS 7671. Changed regulations indexed, cross-referenced, annotated.
No spam. Product notes, build updates, occasional early-access invites.