Reference tools & certificate base
Max Zs, RCD times and BS 7671 Amendment 4 references are live. Certificates are the product base; wider certificate breadth is still under review.
A distribution board starts as design intent, then becomes priced scope, installed work, test evidence, a certificate line, an O&M entry, valuation evidence and a CDE submission. Today, each stage often rebuilds the same facts in a different system.
The board is physical. The work around it is information.
Describe the object once: board, circuit, device, cable, location, standard, evidence. The target is for that object to feed the estimate, certificate, O&M, valuation, document register and handover pack. Assistive workflows move repeatable data. The human keeps control of judgement, approvals and relationships.
Prekon is being built in public: useful tools first, role-level proof next, platform claims only where the work exists.
Max Zs, RCD times and BS 7671 Amendment 4 references are live. Certificates are the product base; wider certificate breadth is still under review.
EICR-linked remedials and estimating are in planning, prototype and source-evidence work: observation-to-quote logic, costed circuits and labour hours as the platform asset.
Real construction roles broken into tasks, costed, scored, then mapped into workflow experiments, approval queues and possible tool-using agents. Document Controller first.
The north-star platform position: design, estimate, certs, O&Ms, document control, payments and handover over one project model.
We take real job descriptions, separate repeatable information work from human judgement, then build the automatable parts in public.
The opening argument for the whole series: construction's physical work remains human; the repeatable operating layer around it is exposed.
Read the foundation pieceRole by role, task by task, with cost, benefit, failure points and practical workflow experiments.
View the seriesThe satellite tools bring working electricians into Prekon through practical, searchable reference pages.
A public lookup for BS 7671 maximum permitted Zs values.
A public lookup for BS 7671 RCD disconnection times and protection checks.
Plain-English companion to BS 7671 Amendment 4, with changed regulations collected for reference.
No spam. Product notes, build updates, possible early-access invites.